Main station|Member Center|Save the desktop|Mobile browsing
Ordinary Member

Qin Chunyuan

contact
  • Contact:秦春媛
  • Phone:020-62928757
home > sell > Aidis Kitchen and Bathroom Waterproofing Expert Colored Kitchen and Bathroom Waterproofing King No. 1 Multi-Color Optional
Aidis Kitchen and Bathroom Waterproofing Expert Colored Kitchen and Bathroom Waterproofing King No. 1 Multi-Color Optional
products: Views:5Aidis Kitchen and Bathroom Waterproofing Expert Colored Kitchen and Bathroom Waterproofing King No. 1 Multi-Color Optional 
brand: 爱迪斯
price: 5.00元/桶
MOQ: 5 桶
Total supply: 20000 桶
Delivery date: Shipped within 3 days from the date of payment by the buyer
Valid until: Long-term validity
Last updated: 2015-05-15 11:51
 
Details

Kitchen and Bathroom Waterproof King
1.
Product Introduction
Kitchen and Bathroom Waterproof King is a two-component waterproof coating made by the company that has recently introduced advanced foreign production technology. It has excellent waterproof performance and easy construction. It is most suitable for waterproof and moisture-proof construction of kitchens and bathrooms in home decoration. It is a representative product of home decoration waterproof materials in the 21st century.
2. Product Features
Oral lotion, non-toxic, odorless, green and environmentally friendly.
Constructed on a wet base surface, it has a certain degree of air permeability.
Components, cold construction, and easy maintenance.
Add color to form a colored coating.
It has stable chemical properties and can effectively block the penetration of carbon ions and chloride ions.
The layer has good toughness and elasticity, and has excellent durability and weather resistance.
The base surfaces of various materials such as cement are firmly bonded.
There will be no flow during construction on surfaces, slopes and top surfaces.
3. Construction method
Base surface treatment
The base surface must be smooth, firm, clean, free of clear water, and have a suitable pH value. Obvious pores and blisters must be plugged and smoothed with cement mortar. , sharp edges should be removed, unevenness and cracks need to be repaired first, and the yin and yang corners should be made into arc corners.
, Construction Technology
You can use a roller, brush or scraper to evenly apply the mixed slurry on the base surface. It is advisable to apply it thinly and multiple times. If the base surface is too dry, it must be moistened first. Generally, more than two coats are required. The second layer should be applied only after the first layer is dry (not sticky to the touch) and should be perpendicular to the direction of the previous layer to avoid missed brushing. Wait until the first layer is completely dry before applying the second layer. You can spray a small amount of water to re-moisten it before painting. The back surface construction must be painted at least three times. Pipe openings, floor drains, and wall corners should be leveled first, and local waterproofing should be strengthened. Only then can you lay ceramic tiles or paint directly on the surface of the waterproof layer.
4. Precautions
The construction temperature should be at ℃, and the construction environment must be ventilated.
It is best to use up the mixed slurry within an hour. If the prepared slurry is not used up within this period, it can still be used after being stirred evenly and without agglomeration.
The water test experiment should be carried out two to three days after construction. The waterproofing test can only be carried out after the waterproof layer is completely dry.
Request for quotation
A total of0articles  Related Comments: